Fall-Back Flex installations
Domica realises Fall-Back Flex installations: quick response to grid congestion
From a complex grid connection to a working technical solution: Domica helps companies respond efficiently to the challenges of grid congestion and Fluvius’s Fall-Back Flex contracts.
The energy transition presents new challenges for businesses. Electrification, additional generation capacity, charging infrastructure, and other energy-intensive applications are driving up demand for electrical power. At the same time, the available capacity of the power grid is not immediately sufficient everywhere.
For businesses in areas where grid congestion is expected, Fluvius’s Fall-Back Flex can offer a solution. Under certain conditions, this temporary connection option makes it possible to establish a new connection or increase connection capacity without necessarily having to wait for additional grid investments.
Domica responds to this need with efficient technical installations and targeted implementation. Thanks to our experience with building technology, integration, and energy management, we help end customers implement the necessary technical solutions in a timely and correct way.
What does grid congestion mean for businesses?
Grid congestion occurs when the demand for transmission capacity on the power grid at a specific time and location threatens to exceed what the grid can safely handle. It is therefore not necessarily a shortage of electricity, but rather a limitation on available transmission capacity.
For businesses, this can have consequences when establishing a new connection or when additional capacity is needed for expansions, electrification, or new technical installations.
Fluvius therefore offers, for example, Fall-Back Flex: a temporary solution that allows businesses to use their requested capacity under normal conditions, but requires them to temporarily reduce it at certain times when the power grid is under strain.
Fall-Back Flex: A contract that requires a technical solution
A Fall-Back Flex contract requires more than just an administrative agreement. To meet the conditions, the necessary technical provisions must be in place to properly implement any power limitation.
The Netflex cabinet from Fluvius plays a key role in this. This device enables the control of the installation during congestion. The specific technical implementation depends on the agreements, the customer’s installation, and the conditions applicable to the connection in question.
For the end customer, proper implementation is essential. The technical installation must function reliably and be able to comply with the requested power reduction, with as little impact on business operations as possible.
Domica makes the difference with efficient implementation
At Domica, we believe in practical solutions that work in day-to-day operations. Our approach focuses on smooth implementation, proper technical integration, and reliable operation of the system.
For Fall-Back Flex projects, three key areas are central to this:
- Efficiency and speed: a goal-oriented approach to implementing the required technical systems as efficiently as possible.
- Proper technical integration: attention to connections, control systems, and the interaction between the relevant components.
- Reliability for the end customer: a solution that takes into account both technical requirements and the continuity of business operations.
By combining our expertise in integration and energy management with a practical, implementation-focused approach, we support companies in taking a significant step in their energy transition.
Successful achievements with end customers
Domica supports end customers in addressing the technical challenges of grid congestion and the implementation of Fall-Back Flex. We have already completed successful installations for retail chains, for example, with a focus on smooth execution and reliable technical integration.
Our focus is on fast and efficient implementation, so that customers can have the necessary equipment installed without unnecessary delays in their project schedules.
Each project requires a customized approach tailored to the existing electrical infrastructure, the technology involved, and Fluvius’s specific requirements. Thorough preparation and smooth coordination among all parties involved help ensure that the implementation proceeds as efficiently as possible.
Looking for a building management system?
DOMICA works behind the scenes, which enables our customers to manage and optimise more with fewer resources. This has a huge impact on both operational and fixed costs (OPEX and CAPEX) within organisations.
For more information, please do not hesitate to contact our service line.
Ready for tomorrow’s challenges
Grid congestion and flexible connection capacity will continue to play a key role in the further electrification of businesses. A well-thought-out technical approach is therefore relevant not only for today’s connections but also for the continued development of energy management and building technology.
Domica remains committed to integration, efficiency, and reliable technical solutions that help businesses move forward.
Is your company dealing with a Fall-Back Flex contract or a technical installation related to grid congestion? Domica would be happy to help you find an efficient solution.
Contact us and discover how we can provide technical support for your project.